| >>>>>>
Diesel generators basic code |
|
| Company
Name: Guangzhou City Weilida Electronic Co.,Ltd
|
1, prior to the commencement of preparations. Each time before booting must Diesel tank inspection of the cooling water or Antifreeze Solution satisfied, such as lack of full increase. Produced oil lubricant oil gauge whether the lack of View, such as lack of provisions to be added to the "Shizumitsu" calibration lines, A closer examination of the availability of components Hidden Fault, found fault to promptly remove before Boot. 2, no-load diesel engine start. Diesel starts to pay attention to the output of the generator air Switches must be closed state. Normal diesel generators started to go through after 3-5 minutes of idle operation (700 rpm bell%) winter weather the low temperature, idle operation to extend the time for a few minutes. Diesel started after the first oil pressure to observe normal and the availability of oil spills and leakage is not a normal phenomenon. (Under normal circumstances oil pressure must 0.2MPa above) found abnormal stands to immediately overhaul. If no anomalies will be upgraded to speed diesel engine rated speed 1500 rpm bell, At this time shows the frequency generator 50HZ, voltage 400V, it can be matched on the air output switch in use. Gensets not allow empty long run. (No-load operation for a long time will nozzle emission diesel combustion can lead to carbon deposition, causing valve, piston ring leakage. ) If automated units, it is not necessary to idle operations, because automation units are generally equipped with water heaters, diesel engine cylinder always keep in southern ยบ% Diesel started after 8-15 seconds in the normal transmission. 3, to observe the operation of the state. Units of the work, should be manned by specialized personnel on duty often possible to observe a series of failures paying particular attention to oil pressure, water temperature, oil temperature, voltage, frequency and other important factors change. Furthermore, we need to pay attention to the availability of sufficient diesel, as in the operation of the fuel disruption caused objective-load Parking, may lead to a generator excitation control systems and related components of the damage. 4, no-load stands. Each stands, they must first load gradually cut, and then closed the air turbine output switch, Finally, the slowdown of the diesel engine idle state running 3-5 minutes longer stands.
|
| Company Name: |
Guangzhou City Weilida Electronic Co.,Ltd |
| Address: |
Guangzhou Zhongshan main road Dongtang mouthbusiness street 6 |
| Contact Person: |
miss zhao |
| Tel: |
020-82365679 |
| Fax: |
|
| E-mail: |
|
| IP: |
218.20.0.13 (2007-5-24 15:34:04) |
|
|
|